Skip to content
SKATEBOARD MANUFACTURINGDiscuss a project ↗

Sampling to shipment

Keep the build
clear from sample
to shipment.

Cold pressing, machining, printing and packing each depend on the decisions made before them. A production brief connects the selected construction, approved appearance and order quantities to those stages.

Production process image placeholder
Product configuration reference. Specifications and artwork are confirmed per order.
OEM / ODM · China-based productionCold pressing · CNC · Graphic applicationFor brands, skate shops & distributors

Production management

Four handovers that keep the order coherent.

The product reference, production work, inspection findings and packing information need to stay connected throughout the run.

01

Product review & approval

The technical handover brings construction, geometry, artwork and components into one build reference. The approved physical sample shows the appearance and fit to be carried into production.

02

Production coordination

Pressing, machining, finishing and packing have different dependencies. Order quantities and approved variants define the work to be coordinated; a change to the build requires a review of the affected stages and timing.

03

Quality review & exceptions

Material, process and finished-product checks identify issues at different stages. A deviation needs its affected product reference, finding, proposed correction and agreed resolution kept together before dispatch.

04

Packing & repeat-order handover

Variant identity, set contents, carton quantity and protection connect the batch to the shipping instruction. A repeat order starts from the approved product reference, with any material, artwork or component change reviewed explicitly.

See the production stages →
Board sample and production handover record

Production references

A clear record connects each handover.

Product approval, production changes and final inspection need to refer to the same order and version.

Approved product reference

Specification & approved sample

Construction, geometry, components, artwork version and packing reference define the build being approved. This is the reference for comparing the sample with later production.

Production & change reference

Order stages & revisions

Order quantity, product version, production stage and any agreed change belong together. A revision review identifies its effect on the product, cost and dispatch plan.

Inspection & packing release

Findings & shipment handover

Inspection scope, findings, agreed resolution and packing details connect the finished batch to its dispatch decision. Open issues need a clear disposition before shipment.

What this means for your business

Fewer ambiguous handovers.

A clear reference makes it easier to identify what has been approved, what has changed and what still needs resolution.

01

Sample to batch

Product details remain comparable when the construction, geometry, graphics and component combination are named together.

02

Changes with context

A change review can address its effect on the product, price and dispatch plan before it becomes a surprise in the finished batch.

03

Receiving & replenishment

Packing and variant information help the buyer identify the shipment and prepare a precise follow-on order.

Board sample and production handover record
05 / AT THE HANDOVER

Make a revision visible on the board.

A changed outline or graphic position needs a clear reference. Bring the revision back to the physical sample so that the discussion stays attached to the part the buyer will receive.

Revised deck sample next to the earlier version
06 / AT THE HANDOVER

Keep the sample question separate from transit.

Plain samples without graphics normally take about 3–5 days. Printed or laser-decorated samples normally take about 7–10 days. Confirm the scope and timing for your project; transit is additional.

Plain deck sample beside a decorated sample
07 / AT THE HANDOVER

Carry the version through packing.

The approved board and the carton need to describe the same order. Confirm the variant mix, labels and packing requirements with the product specification before the production brief is closed.

Deck variants next to their packing labels

Your next production run

Bring us your next production project.

Send your product type, quantity, destination and any drawings or artwork you already have. We will work through the manufacturing options with you.

Start a manufacturing enquiry ↗
Board sample and production handover record